Сходи та столярні вироби
  • 0

The final stage of installation is the installation of skirting boards. This element of the interior does not only aesthetic, but also practical role. The plinth not only hides the joints between the floor and the wall, but also adds a complete, finished look to the dwelling.

Wooden plinth - the most used and traditional type of floor plinth. For solid wood flooring, as well as for parquet flooring or for flooring from a parquet board, a wooden skirting of oak solid is the optimal choice.

In the company Drevych you can order and buy a baseboard oak whole, of any size, natural or varnished.

Price per linear meter (not varnished)

Baseboard of solid oak №11 Width 16mm Height 80mm

  • Brand: Drevych
  • Product Code: 11-1х80p-ц
  • Availability: In Stock
  • 154 грн

Related Products

Tags: Wooden moldings

Calculate the cost

You can leave a request for an individual calculation of the cost here

* Name

* Phone

Comment

Calculate the cost

You can leave a request for an individual calculation of the cost here

* Name

* Phone

Comment

Viewed

Baseboard of solid oak №11 Width 16mm Height 80mm

Baseboard of solid oak №11 Width 16mm Height 80mm

The final stage of installation is the installation of skirting boards. This element of the interior does not only aesthetic, but also practical role. The plinth not only hides the joints between the floor and the wall, but also adds a complete, finished look to the dwelling.Wooden plinth ..

Sweet Love (romantic)

Sweet Love (romantic)

Sketchbook "Sweet Love" A5;• Size: A6;• Pages: 40st.;• Paper: 120g / m2;• Mounts: rings;• Cover: plywood not lacquered;• Interchangeable block of pages;• Layout of pages: without a line;We produce unique eco notebooks for everyday items and creativity. When developing sketchbuks, we set a goal t..

Two march ladders

Two march ladders

Sheathing of concrete stairs by a tree. This staircase is a good example of great looking stairs and inexpensive costs. Due to the fact that there is a lot of space for stairs, it was possible to flood with concrete two straight stairs' flights with the platform between. And when projecting and pri..

How cooperation works
Consultation
and preliminary assessment
Taking measurements
measurements
Forming
a calculation
Contract
with a guarantee
Production
and installation