Сходи та столярні вироби
  • 0

Is the design of the stairs in the interior really that important? Allegedly, the answer is so obvious that there should be no questions. After all, we need not only to invest in the budget, but also to create a single design. And if you have such a question in your head, it is better to turn to professionals immediately.

For example, many of our customers come to us on the stairs, do not know what color they should be or in what style they are designed. In the process of communicating with the client, Drevich not only tries to understand exactly what is needed, but also helps to determine the optimal design of the stairs for your interior.

If you take this project of stairs, they were designed by our designers with a direct march. The material of the steps is glued solid oak 4 cm thick. The steps and decorative plinths are covered with white enamel also made of oak. The stairs were decorated in black and white, this is the so-called contrasting design. The style of the stairs is supposedly simple, but the dark oak steps with a combination of white create a unique design. Stairs without balusters, because of this visually the room seems larger.

If you liked this design or know what kind of stairs you need, then fill out the form for individual calculation of stairs below:

Stairs
Base on the concrete
Timber material of solid rock (oak, ash, beech)
Type of manufacturing glued array
Coating varnish, enamel, oil (optional)
Paints and varnishes Vernikcolor (Italy)
The steps an array of glued, a thickness of 40 mm.
Subcategories an array of glued, a thickness of 20 mm.
Balusters style to choose from
Railing (if necessary) straight, spiral, bent, glued
Application of other materials tempered glass, forging, stainless steel
Production time 25 -50 business days
Measure, design, delivery, installation, warranty Yes

Contrasting straight stairs

  • Brand: Drevych
  • Product Code: СходиПідКлючБетон-Б-24-1
  • Availability: In Stock
  • 7350 грн/step

Tags: Finished stairs

How cooperation works
Consultation
and preliminary assessment
Taking measurements
measurements
Forming
a calculation
Contract
with a guarantee
Production
and installation