Сходи та столярні вироби
  • 0

2nd sort - Nature. Natural wooden slats without significant defects in texture that could impair functionality. Natural differences in colors and textures further emphasize the environmental friendliness of the material and emphasize the zoning of the room.

  • non-flying plastered knots (1-2 pieces) on 1 m of a rail are allowed;
  • allowed for 1 m run. plastered cracks 1 mm wide and up to 200 mm long;
  • the difference in color of a tree is allowed.

Main benefits:

Own production - the product at all stages of production is made in one place and on its own equipment, which allows to control the quality throughout the cycle.

Simple installation - constructively designed parts allow you to install not only a professional, a beginner.

Price - the manufacture of wall panels is one of the key areas of activity that allows you to make this range in large quantities, than reduce the cost per unit of output

We do it for you - we want to say that we are always ready to listen to interesting, creative ideas, and ready for cooperation and suggestions.

 


Wall
The price is indicated for: one running meter
Name rail
Element size 20х40mm
material alder
Paint and varnish materials Vernikcolor (Italy)

Wall decoration with panels 2nd sort - Nature

  • Brand: Drevych
  • Product Code: WP-Order-2nd-sort
  • Availability: In Stock
  • 280 грн/LM(20x40mm)

Calculate the cost

You can leave a request for an individual calculation of the cost here

* Name

* Phone

Comment

Calculate the cost

You can leave a request for an individual calculation of the cost here

* Name

* Phone

Comment

Viewed

Wall decoration with panels 2nd sort - Nature

Wall decoration with panels 2nd sort - Nature

2nd sort - Nature. Natural wooden slats without significant defects in texture that could impair functionality. Natural differences in colors and textures further emphasize the environmental friendliness of the material and emphasize the zoning of the room. non-flying plastered knots (1-2 pieces)..

How cooperation works
Consultation
and preliminary assessment
Taking measurements
measurements
Forming
a calculation
Contract
with a guarantee
Production
and installation